1Strip out
Everything out, back to solid walls. The mess is contained and carried out, not trodden through your hall.

Full bathroom renovations
Joe takes bathrooms from bare walls to finished, photographed and reviewed. This page is one real job, start to finish.
A real job in Barnsley
Stripped to the plaster, first-fixed, boarded, tiled in large-format porcelain and fitted out with a walk-in shower, basin and heated towel rail. The customer put her own photos on Google with the review.


How a bathroom happens
1Everything out, back to solid walls. The mess is contained and carried out, not trodden through your hall.
2Pipework and shower runs in the right places before a single tile goes on.
3Flat, waterproof, and tiled straight. Large-format porcelain needs a fussy hand. That's the job.
4Shower, basin, WC, mirror, sealant. Tested, cleaned, done.
Not just houses
A washroom and kitchenette built from bare blockwork inside a working industrial unit: WC, basin, sink and water heater, all run in copper and tested.



“Would highly recommend. Installed full bathroom including extra fixings including mirror as requested. Extremely clean and tidy. Very polite and went the extra mile to ensure our experience was a good one. Would definitely use again.”
Nicola Sabin · Google review, with her own photos
Tell Joe what you're picturing. He'll tell you what it costs and how long it takes.